"Newsletter abonnieren"-Formular

A.B.S. Silos references

Mühlbach training and further education center

Chimney sweeps rely on renewable energies
Scope of delivery: Flexilo® MAXI HP 24/25
Storage quantity: approx. 11.3 m³ / 7.4 t
Removal: Spiral conveyor system as direct loading
Boiler output: 40 kW

Stefan Wastl from Naturlis: “The chimney sweeps rely primarily on renewable energies and that is why they chose a combination boiler (pellets/logs). In addition, the silo in the new building was simpler and more flexible to design. The conveying takes place using a spiral conveyor system up to the boiler on the ground floor.”

www.kaminkehrerschule.de

Back to references

More references

WordPress Lightbox Plugin